Atlas Electrical Construction, Inc.


Power Selection:  What sources and voltage deliver the maximum efficiency?

Design / Equipment Layout:  The quality of blueprints and the location of electrical components can save thousands of dollars.

Computerized Scheduling:  Clear and reliable milestones encourage jobs to be completed on time.

Product Specifications:  Ensures compatibility with all the other systems within a project.

Budgets:  Reliable cost projections allow Owners, Architects, and Builders to make better decisions.

Building Information Modeling (BIM):  Digital representation of physical and functional characteristics of a facility.  A BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle;  defined as existing from earliest conception to demolition.

Value EngineeringAtlas Electrical Construction can often reduce the overall electrical cost when projects appear over budget.


Special Systems:  Telephone, data networks, fire alarm, nurse call, CCTV, access controls, public address

Utilities:  Sub-divisions, commercial duct banks and auxiliary equipment above 600 volts, and as permitted by local utility companies

Industrial:  Technical plants which generate specific products such as gasoline, asphalt or even bulk foods

Institutional:  Hospitals, schools, prisons, government facilities

Redundant Emergency Power Systems:  Backup generators, manual and automatic transfer switches, temporary power

Renewable Photovoltaic Energy:  Solar arrays, inverters, storage batteries

Commercial:  Strip malls, office buildings, hotels, grocery stores, warehouses, and restaurants